Products List

Contact Us

Tel: 0086-576-84352158
  0086-576-84355158
Fax:0086-576-84357158
Cell:0086-15057227888
CONTACT:MR.PENG
E-mail: info@jnmould.com

PRODUCTION EQUIPMENT

Your Present Position : Home > PRODUCTION EQUIPMENT

The company, capable of finding problems with the MOULD FLOW before mould opening, pays attention to the problems during design and production, and provides solutions to reduce risks, shorten the construction period and improve quality. (For details, see mould flow analysis cases)

 

Mould Flow Analysis Cases :

1. Filling time_TV cover 2. Shrinkage_pail
3. Flow mark_40’Front cover

During filling of hot runner with six valve gates, we can see stagnation occurs in the very center of the upper part and welding marks appear on the main surface.

Open the first gate and then the second and third gates when the melting flow arrives at each of them. In this mode, the top will be filled earlier than the bottom.

Although the mould flow is uneven in the runners, we can reduce the impact arising from the uneven flow by controlling the gates. In addition, four gates on the top can reduce the production of miniature.

Most of the welding marks will appear inside the grids but not on the main surface.

 
Discharge air near the grids.

Copyright(c) Zhejiang Huangyan Jinnuo Mould Co.,Ltd. 2010 All Right Reserved

浙ICP备06036000号-1 Powered by 300.cn